Main page Sitemap
 VIEW WALKTHROUGH
Home  |  Overview  |  Location  |  Plan  | Amenities  |  Specification  |  Club  |  Site Status  |  Contact Us
Specifications
 
Structure Exterior fascia of building
  • RCC framed structure confroming to seismic zone III requirements

  • Parking in open, basement and stilt floor

  • Apartments spread over from first floor to the nineteenth floor level
  • Plastered and painted with 100% acrylic based paint

  • Textured / stone surfaces in selective places as per the design to give an elegant look
Flooring Kitchen platform & sink

Vitrified tiles in the living, dining, bedrooms and kitchen

  • Flooring of superior quality antiskid ceramic tiles in toilets, balconies and wash area
  • Laminated wooden flooring in one bedroom

Note: Size, colour and brand will be of our choice depending on bulk availability.

  • Kitchen platform with black granite (2’ width) and Patti at the edge

  • Two Stainless steel sinks with and without a drain board

Wall tiling Doors /Windows /Ventilators

Superior quality ceramic wall tiles for 2 feet above the platform in kitchens

  • Superior quality ceramic wall tiles for 7’ height from floor level in toilets

Note: Size, colour and brand will be of our choice depending on bulk availability.

  • Teak wood door frame flush shutter with teak veneer on both sides

  • Padauk wood frame teak veneer on one side & commercial veneer on the other side for all other doors

  • Teak wood frame with flush shutter for toilet doors. One side of the door will have PVC lamination for suitable height

  • French doors made of anodized/powder coated aluminium frame and shutters with glass of suitable size

  • Sliding type windows with anodized/powder coated aluminium

  • Aluminium ventilators

Painting finishes TV and telephone cable
  • Walls coated with putty finished with emulsion for living, dining and bedroom

  • Ceiling coated with good quality cement paint and finished with OBD

  • Other internal and external walls coated with putty finish with emulsion paint

  • Melamine finished main door

  • Other doors finished with enamel paint

Note : The colour of the paint wherever not mentioned will be as per our choice.
Alterations in the elevation, fixing of grills and shuttering of A/C points will not be entertained under any circumstances.

  • TV and telephone points in all bedrooms and Living room

  • Intra-communication facility provided for security to each apartment within the complex

  • Provision for internet facility

Electrical Plumbing & sanitary
  • 3 Phase power supply with fully concealed wiring & high quality contemporary electrical switches

  • Common meters for common services in the main board

  • Split AC provision in all bedrooms, living room cum dining rooms

  • Power backup for minimum essential points in every flat, upto 700 W (for 3 BHK apartments) and 500 W (for 2 BHK apartments)

  • All toilets with European water closet (white)
  • The master bedroom toilet with glass shower partition, granite / marble counter wash basin with bottle trap along with jaquar or equivalent CP fittings, good quality vitreous pastel coloured wall mounted WC including seat cover, flush valve, etc.

Other toilets to be fitted with standard sanitary fittings.

 
Home Residential Projects Commercial Projects Intustrial Projects Business News
About us Opaline Tapp Land Press
Careers Skyvilla     Consultant Events
Contact us Panache       News Letter
Sitemap    
   
         
        © Olympiagroups. 2008 - 2009. All rights reserved